Olive Tree Bible · User-contributed screenshot · resized, content unchanged
“1 of 3 Complete” and the next reading, inside the text
While reading Luke 1:75–2:1 (NGÜ, German), a thin progress line sits under the passage label, and a green bar in the text reads “1 of 3 Complete” and “Next – Mat 1:18-25”.
Observed in Olive Tree Bible: app profile, research screenshots and design review.

Design takeaway
Progress tied to today’s assignment, with the next step one tap away, answers “what’s left?” without a dashboard. Check whether reading counts as complete automatically or by choice.
What this example establishes
While reading Luke 1:75–2:1 (NGÜ, German), a thin progress line sits under the passage label, and a green bar in the text reads “1 of 3 Complete” and “Next – Mat 1:18-25”.
Limits and further verification
A still image shows one interface state. Gestures, timing, accessibility, persistence and what happens next were not tested. App version not recorded.
Provenance
- Platform
- iOS app · device model not recorded
- Image origin
- User-contributed screenshot · resized, content unchanged
- Source or capture date
- Captured 22 September 2025 · from embedded image metadata
- Reviewed
- 6 October 2026
- Version
- Not recorded
Screenshot captured by Tobias Treppmann for his app-pattern research and supplied for this design reference. Resized for the web; content unchanged. Interface, imagery and Scripture text remain the property of their respective rights holders.
Compare the relevant patterns
Progress and streaks
Choose between a saved place, completion and a shared date. Explain what the record means.
Research-informed design proposal39 · Habits and spiritual formationA flexible reading rhythm
Help someone choose a reading rhythm—and adjust it when life changes.
Proposed hypothesis105 · Habits and spiritual formationReading plans
Compare calendar dates, a sequence that waits, a weekly rhythm and daily readings with two proposed alternatives: a complete passage as the unit, or returning to the same passage across visits. A streak remains a warning case. Decide what a plan asks of time and what happens after days away.
Research-informed design proposal